Concrete Cost in Honolulu, HI

Concrete for a 20×20 ft (400 sq ft) 4-inch concrete slab in Honolulu, HI costs about $993 ($844–$1,141). Local 2026 price is around $201 per cuyd. Free calculator inside.

Estimated cost — a 20×20 ft (400 sq ft) 4-inch concrete slab
$993
Typical range $844 – $1,141 · about $201 per cuyd in Honolulu
Local unit price
$201
You need
4.94 cu yd
State factor
HI ×1.34
Advertisement

What goes into concrete cost in Honolulu

The line items below are 2026 national averages adjusted by the HI construction-cost factor (×1.34). A written Honolulu quote is usually built from these pieces — use them to sanity-check any bid line by line before you sign.

Cost itemTypical Honolulu priceUnit
Ready-mix concrete, 3,000–4,000 PSI$201 – $248per cu yd delivered
Labor: forming, pouring & finishing$5.36 – $10.72per sq ft
Gravel base & subgrade prep$1.34 – $2.68per sq ft
Wire mesh / rebar reinforcement$0.47 – $1.34per sq ft
Short-load fee (orders under ~4 cu yd)$100 – $201per delivery
Residential flatwork permit$67 – $402per project

Permit fees are set by the city rather than the market — confirm current fees with the local building department.

Estimate your own Honolulu project

Prices in Honolulu, HI run about +34% versus the national average. Enter your dimensions — the calculator starts from the local $201 per cuyd rate; change it to your supplier's quote for an exact figure.

You need
4.94 cu yd
Estimated material cost $993
Area
400 sq ft
Volume
133.33 cu ft
80-lb bags
223

Material shopping list

  • Order about 4.94 cubic yards of concrete.
  • Budget about $993 before delivery, taxes, and labor.
  • Add 5–10% waste for uneven subgrade, cuts, settling, or spillage.

Formula & assumptions

Area = length x width. Volume = area x depth / 12. Cubic yards = cubic feet / 27. Cost = quantity x local unit price.

  • Default depth: 4 inches
  • Default price: $201 per cuyd
  • 80-lb bags yield: 0.6 cu ft each

These assumptions make the estimate easy for search engines and AI answer tools to verify. Replace the default price with your supplier quote for a local estimate.

Concrete cost in Honolulu by project size

Material quantities use the local Honolulu unit price; the last column adds delivery, base prep, and labor at HI-adjusted rates. Click any size for its full breakdown and calculator.

Project sizeYou needMaterial costInstalled estimate
10×10 ft · 4 in1.23 cu yd$248$804 – $1,340
12×12 ft · 4 in1.78 cu yd$357$1,158 – $1,930
12×16 ft · 4 in2.37 cu yd$476$1,544 – $2,573
16×20 ft · 4 in3.95 cu yd$794$2,573 – $4,288
20×20 ft · 4 in4.94 cu yd$993$3,216 – $5,360
24×24 ft · 4 in7.11 cu yd$1,429$4,631 – $7,718
30×40 ft · 4 in14.81 cu yd$2,978$9,648 – $16,080
40×50 ft · 4 in24.69 cu yd$4,963$16,080 – $26,800

Installed ranges assume straightforward access and a buildable subgrade; steep, tight, or poor-soil sites price above the top of the range.

Concrete questions Honolulu homeowners ask

How much does a concrete slab cost in Honolulu?
Materials alone for a 20×20 ft (400 sq ft) 4-inch concrete slab run about $993 in Honolulu. Fully installed — gravel base, forms, reinforcement, labor, and finishing — most homeowners pay $3,216 to $5,360 for the same slab, roughly $8.04–$13.4 per square foot.
What does ready-mix concrete cost per yard in Honolulu?
Plan on $201–$248 per cubic yard delivered for a standard 3,000–4,000 PSI mix in the Honolulu area. Orders under about 4 cubic yards usually add a short-load fee of $100–$201, so small pours cost noticeably more per yard.
Do I need a permit to pour a concrete slab in Honolulu?
Driveways, sidewalks, and anything structural almost always require one; small detached patio pads sometimes fall under the permit threshold. Confirm with the Honolulu building department before you pour — a permit costs far less than being ordered to remove finished work.
Is it cheaper to pour concrete myself in Honolulu?
Labor and finishing account for $5.36–$10.72 per square foot of the installed price, so DIY can roughly halve the cost of a simple pad. But concrete is unforgiving: once the truck arrives you have under two hours to place, screed, and finish. Most first-timers cap DIY at about 100–150 square feet.
How thick should my slab be?
Four inches is standard for patios and walkways; use 5–6 inches for driveways or anything carrying vehicles. Going from 4 to 6 inches adds 50% more concrete, so match the thickness to the real use.
How can I save money on concrete in Honolulu?
Combine small pours into one delivery to clear the short-load threshold, handle your own excavation and gravel base, and collect at least three written Honolulu quotes — 30% spreads between local bids are normal.

Concrete cost in nearby cities

← Full Concrete Calculator

Regional estimate = national average adjusted by a HI cost factor. Not a quote. Actual prices vary by site conditions, access, and supplier.